See the board running around the bottom of the house? That's the elevator board.
Rumor has it that now that the first story is in order (mostly, there's still some leveling going on) that we will start to frame the second story.
You can see some of the new framing here. The northwall had to be rebuilt because of the chimney, which was holding moisture against the wall, so the wood behind it was basically nonexistent (remember our upstairs closet with the skylight?). The odd corner sticking up on the left side of the picture is where the electrical service is attached, so we are working around it for the time being. I went down to the code office to get an electrical permit last week, so we will be installing a new mast soon (today? tomorrow?) so that the electrical can have a more secure place to hang out.
We also have new window openings cut in the foundation for the basement, and framed into the upstairs walls, so things are definitely coming together more than they are coming apart. This is quite an exciting turning point!
1 comment:
How many masts will your house have when its finished? I understand that has a lot to do with how your pirate ship is classified. :)
Layne
Post a Comment